Pre-approved in Vacaville, not in Los Angeles. Building it in Los Angeles would need the city's full plan review.
Showing this plan on your lot at
Los Angeles, CA
See how this design fits on your lot. Drag the ADU footprint to explore placement options.
Fetching parcel boundaries and building footprints...
Calculating setback requirements...
Free. Chris Koss, AIA replies by email within 2 business days.
1 Bedroom, 1-bath detached ADU plan (550 sq ft). 25 by 22 feet, a rectangle. Pre-approved ADU plan published free by the City of Vacaville under AB 1332 as a city standard plan (December 2024), drawn to the 2022 California codes with the July 2024 supplement, so it needs testing against a code cycle update. Each set has three exteriors: Elevation A in stucco, B with board and batten, C with horizontal siding and a stone base. The city decides on a complete application within 30 days; a site plan, truss calculations, Title 24 and a solar plan are still due at submittal.
What this plan could cost and bring in on your lot. Estimates, not quotes.
Estimated all-in cost
$181,000 to $247,000
Leaves out utility upgrades, site work your lot may need and the cost of borrowing. The method behind each figure is below.
Estimated loan payment
Enter your rate
Estimated rent
Not available yet
From a lender's quote.
Open "Rental income estimate" below for a rent figure at your address.
A-du does not quote rates. The payment is figured on the estimated build-cost midpoint, principal and interest only. This is not an offer of credit; financing is provided by third-party lenders, subject to their approval.
Based on square footage and regional construction averages
A speculative estimate from the plan's size and regional construction costs. Confirm it with a licensed general contractor or the plan's architect before making any financial decisions.
This range is a speculative estimate based on typical construction costs where this plan is approved, including design, permits and fees, and on the plan's size. Smaller ADUs cost more per square foot, because a kitchen, a bathroom and utility connections cost about the same at any size. It does not account for site conditions or material selections. Actual costs must be validated with a licensed general contractor or the plan's architect before making any financial decisions.
Jurisdiction
Some West LA and Studio City pockets are unincorporated LA County. Confirm your jurisdiction with the local building department if you are near a boundary.
Estimate based on current fee schedules as of 2026-01-01. Final fees are set at plan check. For LA City projects, the official LADBS calculator lives at netinfo.ladbs.org/feecalc.nsf.
Build Location
Los Angeles, CA
Most homeowners finance ADU construction rather than paying cash. These are the common routes. Talk to a lender you choose; A-du does not arrange loans.
Lenders that underwrite on your home’s value after the ADU is built, often the best fit when current equity doesn’t cover the build.
For owners with substantial equity, a line of credit against the home is typically the simplest and fastest route to fund construction.
California's CalHFA ADU Grant has been out of funds since December 2023. Some cities run their own ADU loans or fee waivers, so check yours before you borrow.
Coming soon on A-du
Drawings, a cost estimate and a rent projection for your lot, put together by a California-licensed architect in the form lenders ask for.
Lenders that finance ADUs, side by side, in no paid order.
Lenders that finance ADUs: see the directory. Lend on ADUs? List your business free.
At 550 sq ft, California bars local impact fees on this plan. School fees start at 500 sq ft, and permit and utility fees still apply.
Learn moreWho handles each step for this plan.
Free from City of Vacaville.
Free. Chris Koss, AIA checks whether it could fit your lot.
A-du connects you with professionals who can help you get your permit.
Hire a licensed contractor.
Pre-approved plan from City of Vacaville
Chris Koss, AIA
Architect, California license C-39677
Chris Koss, AIA, a California-licensed architect who owns A-du, can permit this plan for you, whichever firm drew it. He provides this service personally under a separate written agreement with you (the Permitting Services Agreement). It is not performed by A-du, and A-du takes no part of his fee. You can take the plan to your building department yourself instead.
Pre-approved ADU plan published free by the City of Vacaville under AB 1332 as a city standard plan (December 2024), drawn to the 2022 California codes with the July 2024 supplement, so it needs testing against a code cycle update. Each set has three exteriors: Elevation A in stucco, B with board and batten, C with horizontal siding and a stone base. The city decides on a complete application within 30 days; a site plan, truss calculations, Title 24 and a solar plan are still due at submittal.
Coming soon
$299 per project.
We're deciding whether to build a guided way to permit this plan yourself. Tap Notify me if you'd use it.
Not available yet. Nothing to buy today.
Pre-Approval Status: Confirm pre-approval with your local building department before you rely on it.
Site Review: Pre-approval covers the building design, not your lot. Setbacks, fire department access, firefighting water supply and wildfire hazard zone rules are checked for your address at plan check.
Platform Role: A-du is a technology platform connecting homeowners with design vendors. We do not provide architectural, engineering, or construction services.
Free. Chris Koss, AIA replies by email within 2 business days.
Optional. Provided personally by the California-licensed architect who owns A-du, not by A-du. How it works
About the designer
Pre-approved ADU plan published free by the City of Vacaville under AB 1332 as a city standard plan (December 2024), drawn to the 2022 California codes with the July 2024 supplement, so it needs testing against a code cycle update. Each set has three exteriors: Elevation A in stucco, B with board and batten, C with horizontal siding and a stone base. The city decides on a complete application within 30 days; a site plan, truss calculations, Title 24 and a solar plan are still due at submittal.
Published free