Santa Clara Pre-Approved ADU: Abodu Two+, 800 sq ft

by AboduPre-approved in Santa ClaraDetached ADU

Pre-approved in Santa Clara, not in Los Angeles. Building it in Los Angeles would need the city's full plan review. See plans pre-approved in Los Angeles

2
Bedrooms
2
Bathrooms
800
sq ft
23.6' x 33.9'
Footprint

About this design

Prefabricated, large, detached ADU, 1 story, 800 sf, 2 bedrooms, 2+ bathrooms. By Abodu. Listed by the City of Santa Clara among the Pre-Approved ADU vendors by the State of California. Plans are bought from the designer; contact the designer for licensing and pricing. A site plan and site-specific documents are still required.

  • Dimensions: 33.9' x 23.6' x 10'

Plan Details

ADU TypeDetached
Construction TypePrefab

Showing this plan on your lot at

Los Angeles, CA

Site Plan

See how this design fits on your lot. Drag the ADU footprint to explore placement options.

Click and drag the ADU to reposition
1ADU23.6' x 33.9'
Legend
Lot Boundary
Setbacks (5' side/5' rear)
Structure Buffer (10')
Existing Structures
ADU (23.6' x 33.9')
Setback Conflict
Valid Placement
ADU fits within the buildable zone, clear of all setbacks and existing structures.
Measured
Side lot line140'-11" / 5' min
Rear lot line72'-1" / 5' min
Side lot line171'-11" / 5' min
Side lot line376'-8" / 5' min
Side lot line376'-10" / 5' min
To nearest structure10'-8" / 10' min

Shortest distance from the unit to each controlling line, from the county parcel map. Good to a foot or two; not a survey.

Measurements and setbacks
Property
Lot Size50,000 sq ft
CityCA
Structures2
ADU Design
Footprint23.6' x 33.9'
Area800 sq ft
Height10'
Setbacks
Front Yard15 ft
Side Yard5 ft
Rear Yard5 ft
From Structure10 ft
Max Height16 ft

This site plan is for preliminary planning only. Setback data is based on general municipal guidelines and may not reflect site-specific conditions, easements, or recent zoning changes. Always consult with a licensed professional before proceeding.

Structures on this lot

A garage or shed in the way? Mark it to be removed and see the lot without it.

  • Main houseStays

3D Site View

The ADU at your chosen placement alongside the existing structures on the lot. The navy outline marks the lot boundary; the gray outline marks the buildable area inside the setbacks. Move or rotate the ADU above and the 3D view follows.

Drag to orbit · updates as you move the ADU
Approximate massing · envelope dimensions

Free. Chris Koss, AIA replies by email within 2 business days.

Your numbers

What this plan could cost and bring in on your lot. Estimates, not quotes.

Estimated all-in cost

$356,000 to $479,000

Construction
$344,000 to $467,000
City permit fees
$11,828

Before a site visit. Excludes utility upgrades, site work and borrowing costs. Details below.

Estimated loan payment

Enter your rate

Estimated rent

Not available yet

%
$

Get the rent estimate to compare it with a payment.

A-du does not quote rates. This is not an offer of credit.

About this estimate

The loan is the middle of the all-in cost above, less any down payment you enter. Principal and interest only. A-du does not quote rates. Your rate, term and eligibility depend on the lender and your finances. Financing is provided by third-party lenders, subject to their approval.

Estimated Build Cost Range

Based on square footage and regional construction averages

Low estimate$344,000
High estimate$467,000

A speculative estimate from the plan's size and regional construction costs. Confirm it with a licensed general contractor or the plan's architect before making any financial decisions.

How this is estimated

This range is a speculative estimate based on typical construction costs where this plan is approved, including design, permits and fees, and on the plan's size. Smaller ADUs cost more per square foot, because a kitchen, a bathroom and utility connections cost about the same at any size. It does not account for site conditions or material selections. Actual costs must be validated with a licensed general contractor or the plan's architect before making any financial decisions.

Permit Fees

Jurisdiction

Detected from address

Some West LA and Studio City pockets are unincorporated LA County. Confirm your jurisdiction with the local building department if you are near a boundary.

Estimated Total Permit Fees$11,828
Based on a construction valuation of $184,000 ($230/sqft × 800 sqft).

Building Permit

  • Building Permit Fee
    LAMC 91.107 Table 1-A
    $2,181.00

Plan Check

  • Plan Check Fee
    LAMC 91.107.6
    $1,962.90

Sub-Permits

  • Electrical Sub-Permit
    LAMC 93.0205
    $228.00
  • Plumbing Sub-Permit
    LAMC 94.0203
    $305.00
  • Mechanical Sub-Permit
    LAMC 95.115
    $206.00

Hillside Project

  • Grading Permit
    LAMC 91.7000s (Hillside Ordinance Area)
    Not applicable: parcel in hillside is false.
    $0.00
  • Hillside Plan Review
    LAMC 91.7016 + LADBS Hillside Plan Check policy
    Not applicable: parcel in hillside is false.
    $0.00

Fire Department

  • Fire Sprinkler Plan Review
    LAMC 57 (LAFD)
    SB 1226 exempts ADUs <=1200sf attached to a sprinklered SFD.
    $0.00

City Surcharges

  • General Plan Maintenance Surcharge
    LAMC 98.0418(b)
    $290.07

State Surcharges

  • CA Building Standards Commission Surcharge (SB 1473)
    CA Health & Safety Code 18931.6 (SB 1473, 2008)
    $7.36
  • Strong Motion Instrumentation (SMIP) Fee
    CA Public Resources Code 2705 (Strong Motion Instrumentation Program)
    $23.92

Administrative

  • Records Management
    LADBS Fee Schedule
    $160.00

Construction Tax

  • Construction Tax
    LAMC 21.10
    $160.00

Utility Connections

  • Sewer Facility Charge
    LAMC 64.11.3
    ADU connecting to existing sewer lateral; no new SFC.
    $0.00
  • New Water Service Connection
    LADWP Water Rules + Tariff
    Not applicable: needs new water service is false.
    $0.00
  • New Electric Service Connection
    LADWP Electric Rules + Service Standards
    Not applicable: needs new electric panel is false.
    $0.00

Impact Fees

  • Impact Fee
    LAMC 19.17 + CA Gov. Code 66311.5(c)(1) (750 sqft exemption)
    $2,000.00
  • School District Development Fee
    CA Education Code 17620; Gov. Code 66311.5(c)(3); LAUSD Level 1 rate
    $4,304.00

Estimate based on current fee schedules as of 2026-01-01. Final fees are set at plan check. For LA City projects, the official LADBS calculator lives at netinfo.ladbs.org/feecalc.nsf.

Rental income estimate

Build location

Los Angeles, CA

Financing Your Build

Most homeowners finance ADU construction rather than paying cash. These are the common routes. Talk to a lender you choose; A-du does not arrange loans.

Renovation and ADU construction loans

Lenders that underwrite on your home’s value after the ADU is built, often the best fit when current equity doesn’t cover the build.

Home equity (HELOC / home equity loan)

For owners with substantial equity, a line of credit against the home is typically the simplest and fastest route to fund construction.

Grants and public programs

California's CalHFA ADU Grant has been out of funds since December 2023. Some cities run their own ADU loans or fee waivers, so check yours before you borrow.

Before you apply

  • You live in the home: most ADU loans are for a primary residence.
  • Plans, a contractor and a detailed cost estimate.
  • Permits, or a clear path to them. Some lenders want them before you apply.
  • Membership, if the lender is a credit union.

Lenders that count ADU rent toward your income count up to 75% of it. The rent shown on this page is a cash-flow view, not what a lender will count.

What each lender asks for, by area

Start your project file

One file with what lenders ask to see about your ADU: the plan, a test fit on your lot, the cost and a rent estimate.

$495, credited toward permitting. The first step is free.

See what lenders ask for. Lend on ADUs? List your business free.

Your path to a finished ADU

Who handles each step for this plan.

  1. 1
    Check your lot
  2. 2
    Get the plan
  3. 3
    Get the permit
  4. 4
    Build
  5. 5
    Rent it out
  1. 1
    Check your lot

    Free. Chris Koss, AIA checks whether it could fit your lot.

  2. 2
    Get the plan

    The firm that drew it hasn't listed it on A-du yet.

  3. 3
    Get the permit

    Permitting isn't offered here yet.

  4. 4
    Build

    Hire a licensed contractor.

    Find licensed contractors
  5. 5
    Rent it out

    List it on A-du for free once it passes final inspection.

About the Vendor

Abodu
Abodu

Source and Availability

Is this your design?

Claiming it is free. We review takedown requests within 5 business days.

Claim This Design

Important Information

Pre-Approval Status: Confirm pre-approval with your local building department before you rely on it.

Site Review: Pre-approval covers the building design, not your lot. Setbacks, fire department access, firefighting water supply and wildfire hazard zone rules are checked for your address at plan check.

Platform Role: A-du is a technology platform connecting homeowners with design vendors. We do not provide architectural, engineering, or construction services.