Pre-approved in San Joaquin County, not in Los Angeles. Building it in Los Angeles would need the city's full plan review.
2 Bedroom, 2-bath detached ADU plan (750 sq ft). One story with covered patios and a 6.5:12 roof. ADU plan set published free by San Joaquin County Planning and Development Services, which calls its plans pre-approved prototype plans in its Design Manual for ADUs. The county posts an ADU Hold Harmless Agreement with the plans, and a site plan is still required.
See how this design fits on your lot. Drag the ADU footprint to explore placement options.
Shortest distance from the unit to each controlling line, from the county parcel map. Good to a foot or two; not a survey.
This site plan is for preliminary planning only. Setback data is based on general municipal guidelines and may not reflect site-specific conditions, easements, or recent zoning changes. Always consult with a licensed professional before proceeding.
The ADU at your chosen placement alongside the existing structures on the lot. The navy outline marks the lot boundary; the gray outline marks the buildable area inside the setbacks. Move or rotate the ADU above and the 3D view follows.
Jurisdiction
Some West LA and Studio City pockets are unincorporated LA County. Confirm your jurisdiction with the local building department if you are near a boundary.
Based on square footage and regional construction averages
This range is a speculative estimate based on typical construction costs where this plan is approved, including design, permits and fees, and on the plan's size. Smaller ADUs cost more per square foot, because a kitchen, a bathroom and utility connections cost about the same at any size. It does not account for site conditions or material selections. Actual costs must be validated with a licensed general contractor or the plan's architect before making any financial decisions.
Build Location
Los Angeles, CA
Most homeowners finance ADU construction rather than paying cash. These are the common routes. Talk to a lender you choose; A-du does not arrange loans.
Illustration only, assuming a 20-year fixed loan at 8.5% APR on the estimated build-cost midpoint. Your rate, term, and eligibility depend on the lender and your finances. This is not an offer of credit; financing is provided by third-party lenders, subject to their approval.
Lenders that underwrite on your home’s value after the ADU is built, often the best fit when current equity doesn’t cover the build.
For owners with substantial equity, a line of credit against the home is typically the simplest and fastest route to fund construction.
California periodically funds ADU grant programs (e.g. the CalHFA ADU Grant for predevelopment costs, when funded). Worth checking before you borrow.
ADU plan set published free by San Joaquin County Planning and Development Services, which calls its plans pre-approved prototype plans in its Design Manual for ADUs. The county posts an ADU Hold Harmless Agreement with the plans, and a site plan is still required.
Pre-approved plan from San Joaquin County
Chris Koss, AIA, the California-licensed architect who owns A-du, can permit this plan for you, whichever firm drew it.
Pre-Approval Status: Pre-approval information is provided by the vendor and should be verified directly with your local building department.
Site Review: Pre-approval covers the building design, not your lot. Where it sits on your property still has to meet setbacks, fire department access, water supply for firefighting and, where the lot is in a wildfire hazard zone, wildland-urban interface building rules. The building and fire departments check these for every address at plan check.
Cost Estimates: All pricing information is provided by the vendor as estimates only. Actual costs may vary.
Platform Role: A-du is a technology platform connecting homeowners with design vendors. We do not provide architectural, engineering, or construction services.
Optional; at checkout you pay only the flat fee (credit cards, when offered, add a 2.99% surcharge). This plan is free from San Joaquin County either way. Get the plan, then request permitting by Chris Koss, AIA from your plan dashboard.
Chris Koss, AIA, a California-licensed architect who owns A-du, provides this permitting service personally under a separate written agreement with you (the Permitting Services Agreement). It is not performed by A-du, and A-du takes no part of his fee. You can take the plan to your building department yourself instead.
Coming soon
$299 per project.
We're deciding whether to build a guided way to permit this plan yourself. Tap Notify me if you'd use it.
Not available yet. Nothing to buy today.
About the designer
ADU plan set published free by San Joaquin County Planning and Development Services, which calls its plans pre-approved prototype plans in its Design Manual for ADUs. The county posts an ADU Hold Harmless Agreement with the plans, and a site plan is still required.
Published free