Citrus Heights Permit Ready ADU: 2 Bedroom, 749 sq ft

by Citrus Heights (Permit Ready ADU Plans)Pre-approved in Citrus HeightsDetached ADU

Pre-approved in Citrus Heights, not in Los Angeles. Building it in Los Angeles would need the city's full plan review.

Showing this plan on your lot at

Los Angeles, CA

2
Bedrooms
1
Bathrooms
749
Sq Ft
25' x 35'
Footprint

Site Plan

See how this design fits on your lot. Drag the ADU footprint to explore placement options.

Click and drag the ADU to reposition
1ADU25' x 35'
Legend
Lot Boundary
Setbacks (5' side/5' rear)
Structure Buffer (10')
Existing Structures
ADU (25' x 35')
Setback Conflict
Valid Placement
ADU fits within the buildable zone, clear of all setbacks and existing structures.
Measured
measuring

Move the unit and the distances to each lot line appear here.

Measurements and setbacks
Property
Lot Size50,000 sq ft
CityCA
Structures2
ADU Design
Footprint25' x 35'
Area749 sq ft
Height10'
Setbacks
Front Yard15 ft
Side Yard5 ft
Rear Yard5 ft
From Structure10 ft
Max Height16 ft

This site plan is for preliminary planning only. Setback data is based on general municipal guidelines and may not reflect site-specific conditions, easements, or recent zoning changes. Always consult with a licensed professional before proceeding.

Structures on this lot

A garage or shed in the way? Mark it to be removed and see the lot without it.

  • Main houseStays

3D Site View

The ADU at your chosen placement alongside the existing structures on the lot. The navy outline marks the lot boundary; the gray outline marks the buildable area inside the setbacks. Move or rotate the ADU above and the 3D view follows.

Building 3D site view…

Free. Chris Koss, AIA replies by email within 2 business days.

About this design

2 Bedroom, 1-bath detached ADU plan (749 sq ft). 35 by 25 feet overall. Four exteriors: Pine with a standard roof, Oak with a hip roof, Redwood and Walnut with a shed roof. Permit Ready ADU plan published free by the City of Citrus Heights through a state LEAP grant, drawn by Jackson and Sands Engineering with a choice of roof lines and exterior finishes and a reversed layout option. Designed under the 2019 California Residential Code, so it needs testing against a code cycle update. A site plan and a hold harmless agreement are required.

  • Dimensions: 35' x 25' x 10'

Plan Details

ADU TypeDetached

Your numbers

What this plan could cost and bring in on your lot. Estimates, not quotes.

Estimated all-in cost

$226,000 to $343,000

Construction
$212,000 to $329,000
City permit fees
$9,313
Permitting service (optional)
$5,000

Leaves out utility upgrades, site work your lot may need and the cost of borrowing. The method behind each figure is below.

Estimated loan payment

Enter your rate

Estimated rent

Not available yet

%

From a lender's quote.

Open "Rental income estimate" below for a rent figure at your address.

A-du does not quote rates. The payment is figured on the estimated build-cost midpoint, principal and interest only. This is not an offer of credit; financing is provided by third-party lenders, subject to their approval.

Estimated Build Cost Range

Based on square footage and regional construction averages

Low estimate$212,000
High estimate$329,000

A speculative estimate from the plan's size and regional construction costs. Confirm it with a licensed general contractor or the plan's architect before making any financial decisions.

How this is estimated

This range is a speculative estimate based on typical construction costs where this plan is approved, including design, permits and fees, and on the plan's size. Smaller ADUs cost more per square foot, because a kitchen, a bathroom and utility connections cost about the same at any size. It does not account for site conditions or material selections. Actual costs must be validated with a licensed general contractor or the plan's architect before making any financial decisions.

Permit Fees

Jurisdiction

Detected from address

Some West LA and Studio City pockets are unincorporated LA County. Confirm your jurisdiction with the local building department if you are near a boundary.

Estimated Total Permit Fees$9,313
Based on a construction valuation of $172,270 ($230/sqft × 749 sqft).

Building Permit

  • Building Permit Fee
    LAMC 91.107 Table 1-A
    $2,093.03

Plan Check

  • Plan Check Fee
    LAMC 91.107.6
    $1,883.73

Sub-Permits

  • Electrical Sub-Permit
    LAMC 93.0205
    $228.00
  • Plumbing Sub-Permit
    LAMC 94.0203
    $255.00
  • Mechanical Sub-Permit
    LAMC 95.115
    $206.00

Hillside Project

  • Grading Permit
    LAMC 91.7000s (Hillside Ordinance Area)
    Not applicable: parcel in hillside is false.
    $0.00
  • Hillside Plan Review
    LAMC 91.7016 + LADBS Hillside Plan Check policy
    Not applicable: parcel in hillside is false.
    $0.00

Fire Department

  • Fire Sprinkler Plan Review
    LAMC 57 (LAFD)
    SB 1226 exempts ADUs <=1200sf attached to a sprinklered SFD.
    $0.00

City Surcharges

  • General Plan Maintenance Surcharge
    LAMC 98.0418(b)
    $278.37

State Surcharges

  • CA Building Standards Commission Surcharge (SB 1473)
    CA Health & Safety Code 18931.6 (SB 1473, 2008)
    $6.89
  • Strong Motion Instrumentation (SMIP) Fee
    CA Public Resources Code 2705 (Strong Motion Instrumentation Program)
    $22.40

Administrative

  • Records Management
    LADBS Fee Schedule
    $160.00

Construction Tax

  • Construction Tax
    LAMC 21.10
    $149.80

Utility Connections

  • Sewer Facility Charge
    LAMC 64.11.3
    ADU connecting to existing sewer lateral; no new SFC.
    $0.00
  • New Water Service Connection
    LADWP Water Rules + Tariff
    Not applicable: needs new water service is false.
    $0.00
  • New Electric Service Connection
    LADWP Electric Rules + Service Standards
    Not applicable: needs new electric panel is false.
    $0.00

Impact Fees

  • Impact Fee
    LAMC 19.17 + CA Gov. Code 66311.5(c)(1) (750 sqft exemption)
    Waived under Gov. Code 66311.5(c)(1) for ADUs at or below 750 sqft.
    $0.00
  • School District Development Fee
    CA Education Code 17620; Gov. Code 66311.5(c)(3); LAUSD Level 1 rate
    $4,029.62

Estimate based on current fee schedules as of 2026-01-01. Final fees are set at plan check. For LA City projects, the official LADBS calculator lives at netinfo.ladbs.org/feecalc.nsf.

Rental Income Estimate

Build Location

Los Angeles, CA

Financing Your Build

Most homeowners finance ADU construction rather than paying cash. These are the common routes. Talk to a lender you choose; A-du does not arrange loans.

Renovation & ADU construction loans

Lenders that underwrite on your home’s value after the ADU is built, often the best fit when current equity doesn’t cover the build.

Home equity (HELOC / home equity loan)

For owners with substantial equity, a line of credit against the home is typically the simplest and fastest route to fund construction.

Grants & public programs

California's CalHFA ADU Grant has been out of funds since December 2023. Some cities run their own ADU loans or fee waivers, so check yours before you borrow.

Coming soon on A-du

  • Lender-ready package

    Drawings, a cost estimate and a rent projection for your lot, put together by a California-licensed architect in the form lenders ask for.

  • Compare ADU lenders

    Lenders that finance ADUs, side by side, in no paid order.

Lenders that finance ADUs: see the directory. Lend on ADUs? List your business free.

ADU incentives

California fee break

At 749 sq ft, California bars local impact fees on this plan. School fees start at 500 sq ft, and permit and utility fees still apply.

Learn more

Your path to a finished ADU

Who handles each step for this plan.

  1. 1
    Get the plan
  2. 2
    Check your lot
  3. 3
    Get the permit
  4. 4
    Build
  5. 5
    Rent it out
  1. 1
    Get the plan

    Free from City of Citrus Heights.

  2. 2
    Check your lot

    Free. Chris Koss, AIA checks whether it could fit your lot.

  3. 3
    Get the permit

    A-du connects you with professionals who can help you get your permit.

  4. 4
    Build

    Hire a licensed contractor.

  5. 5
    Rent it out

    List it on A-du for free once it passes final inspection.

    See what it could rent for

Who does the work

Pre-approved plan from City of Citrus Heights

Chris Koss, AIA

Architect, California license C-39677

  • Checks whether this plan could fit your lot. Free, with a reply by email within 2 business days.
  • Optional, for a flat $5,000. Get the plan, then request permitting from your plan dashboard.

Chris Koss, AIA, a California-licensed architect who owns A-du, can permit this plan for you, whichever firm drew it. He provides this service personally under a separate written agreement with you (the Permitting Services Agreement). It is not performed by A-du, and A-du takes no part of his fee. You can take the plan to your building department yourself instead.

About the designer

Citrus Heights (Permit Ready ADU Plans)
Citrus Heights (Permit Ready ADU Plans)

Permit Ready ADU plan published free by the City of Citrus Heights through a state LEAP grant, drawn by Jackson and Sands Engineering with a choice of roof lines and exterior finishes and a reversed layout option. Designed under the 2019 California Residential Code, so it needs testing against a code cycle update. A site plan and a hold harmless agreement are required.

Coming soon

Permit it yourself, step by step.

$299 per project.

We're deciding whether to build a guided way to permit this plan yourself. Tap Notify me if you'd use it.

Not available yet. Nothing to buy today.

Important Information

Pre-Approval Status: Confirm pre-approval with your local building department before you rely on it.

Site Review: Pre-approval covers the building design, not your lot. Setbacks, fire department access, firefighting water supply and wildfire hazard zone rules are checked for your address at plan check.

Platform Role: A-du is a technology platform connecting homeowners with design vendors. We do not provide architectural, engineering, or construction services.

Similar ADU designs

ADU98: 1-story, 2-bedrooms, 2 bathrooms (921 sf) by Aging in Place

ADU98: 1-story, 2-bedrooms, 2 bathrooms

by Aging in Place

Price on claim
2 bd
1 ba
921 sq ft
ADU97: 1-story, 1-bedroom, 1 bathroom (569 sf) by VL Architects

ADU97: 1-story, 1-bedroom, 1 bathroom

by VL Architects

Price on claim
1 bd
1 ba
569 sq ft
City of Salinas ADU Plan 2A: 2 Bedroom, 749 sq ft

City of Salinas ADU Plan 2A: 2 Bedroom, 749 sq ft

by City of Salinas

Free plan
2 bd
2 ba
749 sq ft
City of Vista Pre-Approved ADU: 2 Bedroom, 749 sq ft

City of Vista Pre-Approved ADU: 2 Bedroom, 749 sq ft

by City of Vista

Free plan
2 bd
1 ba
749 sq ft
Riverside County ADU Plan 3: 2 Bedroom, 749 sq ft

Riverside County ADU Plan 3: 2 Bedroom, 749 sq ft

by County of Riverside

Free plan
2 bd
1 ba
749 sq ft
San Joaquin County ADU Plan 4: 2 Bedroom, 750 sq ft

San Joaquin County ADU Plan 4: 2 Bedroom, 750 sq ft

by San Joaquin County

Free plan
2 bd
2 ba
750 sq ft
Garden Grove Pre-Approved ADU ADUGO-CP-3: 2 Bedroom, 750 sq ft

Garden Grove Pre-Approved ADU ADUGO-CP-3: 2 Bedroom, 750 sq ft

by City of Garden Grove

Free plan
2 bd
2 ba
750 sq ft
Paramount Pre-Approved ADU ADU-2: 2 Bedroom, 750 sq ft

Paramount Pre-Approved ADU ADU-2: 2 Bedroom, 750 sq ft

by City of Paramount

Free plan
2 bd
2 ba
750 sq ft
Free

Published free